Changeover Groups are the groups defined within different Item Types.

Ex:

...

Item Type

...

Changeover Groups

...

Blend 
    • Organic Blend
    • Inorganic Blend
    • Herbal

...

Pack Type

Changeover Groups are:

    • Pack Type 1
    • Pack Type 2

...

Rules CreationChangeover Group Setup:

  1. Open Production Schedule RulesChangeover Group
  2. Clicking on NEW displays the following screen:
    Image RemovedImage Added
  3. The fields in the Production Schedule Rules Changeover Group screen are listed below:

    Field Name

    Description

    Example

    Rule NameChangeover Group

    Enter the rule name as desired

    BLEND CHANGEOVER

    Constraint Type

    Select the type of constraint from the below list:

    • Resource Constraint
    • Finite Constraint
    Resource Constraint

    Changeover Criteria

    Select the type of changeover criteria from the below list:

    • Pack Type Change
    • Blend Change
    Blend Change

    Remarks

    Enter desired comment

     

    Priority Order

    Enter a number to set the priority of the rule

    1

    Color

    Selected color for the rule will be displayed here

     
    Active

    Select the state of rule:

    Image RemovedTicked indicates active

    Image RemovedUnticked indicates inactive

     
  4. Clicking on Set Color opens the below screen.
    Image Removed
  5. User can choose a color for the defined rule.
  6. name of the Changeover Group

    Organic Blend

    Description

    Enter the description of the Changeover Group

    Organic Blend

    Type

    Displays all the available active Production Schedule Rules of Type Resource Constraint. Users can select anyone of them.

    Blend Changeover

    Blend / Pack Type Grid

    Lists all the available Blend Items / Pack Types based on the selected Type [Production Schedule Rule]. 

    • If selected Rule belongs to Blend change [Changeover criteria] > then Items of Category Blend are listed.
    • If selected Rule belongs to Pack Type Change [Changeover criteria] > then Pack Types are listed.

    User can add the required items to the group.

     
  7. In order to edit a Changeover Group, click on the desired group in Changeover Groups In order to edit a Production Schedule Rule, click on the desired rule in Production Schedule Rules screen to highlight it in the summary list.
  8. Double click on the highlighted row or click on OPEN. The Production Schedule Rule DetailChangeover Group Detail screen opens.
  9. The desired fields can be edited.
  10. Clicking Save saves the Production Schedule Rulethe Changeover Group
  11. Clicking Delete deletes the Production Schedule Rulethe Changeover Group