a. Following is the sample BOM Calculator section in Blend Management screen
b. The user will setup the required parameters in this section as below to calculate required BOM for a blend sheet
Sl.no | Data | Description |
---|---|---|
1 | Mfg. Cell | All available Manufacturing Cells for the blend will be listed. The user will select the Manufacturing Cell for which the blend sheet(s) will be created |
2 | Due Date | Blend Sheet Due Date |
3 | Blend Bin Size | All available blenders within the blend line will be listed The user will select the blender with which the blend sheet(s) need to be created |
4 | Qty to produce | Quantity to produce in each blend sheet Note: This quantity will be less than or equal to Blend Bin Size |
5 | Comment | Any user comment regarding the blend sheet will be entered in this |
c. No. of blend sheets to be created ("# of Sheet" data)
> "# of Sheet" will be by default 1
> When the blend sheet is saved, "# of Sheet" should be 1 as only single blend sheet can be saved
> When the blend sheet(s) are released, "# of Sheet" can be 1 or multiple, Make will release maximum possible blend sheets with the available selected blend sheet lots quantity
>
d.