You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Current »

a. Following is the sample BOM Calculator section in Blend Management screen

b. The user will setup the required parameters in this section as below to calculate required BOM for a blend sheet

Sl.noDataDescription
1Mfg. Cell

All available Manufacturing Cells for the blend will be listed. The user will select the

Manufacturing Cell for which the blend sheet(s) will be created

2Due DateBlend Sheet Due Date
3Blend Bin Size

All available blenders within the blend line will be listed The user will select the

blender with which the blend sheet(s) need to be created

4Qty to produce

Quantity to produce in each blend sheet

Note: This quantity will be less than or equal to Blend Bin Size

5CommentAny user comment regarding the blend sheet will be entered in this

c. No. of blend sheets to be created ("# of Sheet" data)

    > "# of Sheet" will be by default 1

    > When the blend sheet is saved, "# of Sheet" should be 1 as  only single blend sheet can be saved

    > When the blend sheet(s) are released, "# of Sheet" can be 1 or multiple, Make will release maximum possible blend sheets with the available selected blend sheet lots quantity

    > 

d. 

 

  • No labels