Schedule:
Schedule screen displays all the existing schedules as shown in the below screen shot.
Schedule screen displays the following information:
Column Name | Description |
---|---|
Schedule No | Schedule number |
Scheduled Date | Schedule created date |
Calendar Name | Name of the Calendar |
Line | Name of the Production Line |
Location | Name of the Location |
Default | - Default schedule - Not default schedule |
Button | Function |
---|---|
To create a New schedule | |
User can either select and double click on the schedule row from the grid ( or) Click on VIEW to open the selected schedule details screen | |
To Refresh the screen. | |
To export schedule details to Excel, PDF or Text document. | |
To close the schedule screen |
Overview:
- FG work orders that are created for specific production lines in MAS500 based on the forecast and sales order populate in iMake for scheduling
- The user can manage the work order schedule in this screen
- The user can configure the calendar which will have holidays, shifts and available machines for each day in production lines
- The calendar information is applied while scheduling the work orders
- The user can view the work order schedule and available machines for the production line based on the calendar setup
- The user can release the work orders for production, prioritize the production schedule for the work orders
- The user can freeze/unlock work orders as per requirement. No operation is allowed on the frozen work orders
- The schedule window can be opened by clicking on "Schedule" under "Scheduling" as shown below:
Work Orders Scheduling:
- FG Work orders will be listed by selecting the calendar, schedule number and production line
Each work order will have the following information
Column Name | Description |
---|---|
Work Order | Work Order number |
Quantity | Work Order Quantity |
Balance Quantity | Balance Quantity |
UOM | UOM for material quantity |
Expected Date | Schedule Expected date |
Scheduled Start Date | Schedule Start Date |
Scheduled End Date | Schedule End Date |
Earliest Start Date | User can select the earliest start date |
Priority Order | Priority Order |
Change Over Time | Change Over Time |
Status (Dropdown) | User can select the status |
Machine Count | Available Machines count |
Freeze (Check Box) | User can freeze/unlock the Work Order |
Item | FG Material name |
Description | Material Description |
Shift | Shift Name |
Make Type | Production make type |
Order Date | Date created |
Blend | Blend name used for Material |
Packing | Pack Type |
Comments | Work Order user comments |
Additional Comments | Comment fields not visible to FG screen |
Note | Will Display the comments for deviations. |
Change Line(Dropdown) | User can change the line. |
- The work orders are displayed in sorted order based on "Priority Order"
- The Expected Date or Priority Order can be changed or modified as required
- All the new work orders have status "NEW"
- The user will have to change the status of a "NEW" work order to "OPEN" in order to schedule
- Once the work order is open, it can be released to allow production
- The user can freeze/unlock any work order till the work order is started in production
- The user can close any work order as required
- After making changes in work order or priority, the work order should be re-schedule
- The work orders are color coded based on status. This color code can be defined as required