Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
  1. Navigate to Manufacturing --> Blend Management.
  2. Click on New button
    Image Added
  3. Blend Management form will be loaded.
    Image Added
  4. Double click on existing demand no.
  5. Blend BOM Calculator will be populated.
  6. Select the Blend Bin Size.
    Image Added
  7. Click on Calculate button.
  8. Blend Input Items section will be populate with configured input materials
    Image Added
  9. Double click on one of the Blend Input Items
  10. Available Lots will be populated.
    Image Added
  11. Double click on Available Lots.
  12. Lot Selector will be populated.
    Image Added
  13. Click on Add buton.
  14. Lot will be added to Selected Lots
    Image Added
  15. Click on Save button.
  16. Work Order No should be generated by system
    Image Added
  17. Click on Release for Production